Trinity Hospital Expansion (524 tons):

3 story hospital expansion in Rock Island, IL with Industrial Steel Erectors. Project included structural steel fabrication and misc. steel items. This was the first project for TSF using proprietary SidePlate moment connections. Using the SidePlate system included coordination of both shop and field visit by SidePlate systems, as well as special shop testing.



6410 7th St. Ct. SW, Suite C, Cedar Rapids, IA 52404    MAPS    Phone: 319-365-7133    Fax: 319-365-2410