Centennial High School (561 tons):

2 story high school with gymnasium in Ankeny, IA with CSI Construction. Project included structural framing, stairs, rails, and gymnasium joists. Coordination was required for piping through joist in gymnasium.



6410 7th St. Ct. SW, Suite C, Cedar Rapids, IA 52404    MAPS    Phone: 319-365-7133    Fax: 319-365-2410